Equipment

MARG Karaikal Port is equipped with the latest state-of-the-art equipment to enable fast, smooth and safe unloading and evacuation of all types of cargo.

S.No Particulars Units
1 Leibherr LHM 400 3 Nos
2 Stacker Reclaimer System (under construction) 2 Nos
3 Ship Unloader System (under construction) 2 Nos
4 Reach Stackers (under construction) 4 Nos
5 12 CBM Grab 4 Nos
6 Automatic Bagging Machine 5 Nos
7 Hopper 4 Nos
8 Conveyor System (under construction) 5,500 Mts
9 In-Motion Wagon Loading System (under construction) 1 Nos
10 Truck Loading Stations (Coal - 1 & Liquid Cargo - 1) (under construction) 2 Nos
11 General Purpose Crane 1 Nos

In addition to these, the Port is fully equipped with all the requisite material handling equipment such as Loaders, Excavators, Tippers and Fork-Lifts etc. Loading arm for discharging crude oil from the vessel to the plant pipeline was recently commissioned. Truck loading system with a capacity of 900 TPH capable of loading 3 trucks at the same time all with their respective weigh bridge is being installed. Active engineering support to both port and ship facilities such as Electrical and Mechanical workshops have also been proposed within the premises.