The total Backup land area is approximately 606 acres. Marg has a strategic alliance with Pembinaan Redzai Sdn Bhd, Malaysia, one of the holding companies of Westports-Port Kellang.
Phase- 1
- Berthing Length of 460m
- Water Depth of 14 to 15m
- Self Owned Cutter suction Dredger
- Harbour Mobile Cranes with 37 CBM Grabs and attachments to handle Bulk, Timber, Granite and Containers.
- Ware houses
- Suitable Weighbridges
- Open Storage area of 175000 sqmtrs
- Yard equipments like Dumpers, Payloaders, Cranes etc.
- Bunkering facility
- Day and Night all weather Navigation facility
- Self Diagnostics equipped Channel for Day and Night
- Customs and Immigration support
- Medical Centre, Fire Fighting equipments, Dust Suppression systems
Phase- 2 with additional facility as under:
- Mechanized Bulk Ship Unloading facility with Rail mounted Grab type Ship Unloaders with Capacity 2000 TPH each
- Conveying system from Berth to Stock yard and from Stock yard to Rail yard
- Rapid In-motion Wagon Loading system
- Dedicated Container Terminal with berthing length of 600m
- RMQCs and RTGCs for Containers handling
- Out Port CFS facility
- Liquid handling facility
The acquisition of MARG Cauvery, a 2000 CBM Cutter Suction Dredger, will ensure the port to commission as on target, and also help to sustain depths and tranquility for the port. Its outstanding location, spirited tariff composition and modern port management system will approve economic growth. |